Why Scrap Transport Is a Discipline of Its Own
Scrap metal is not ordinary cargo. Its density, irregular geometry and sharp edges demand a specific approach to both loading and stowage. A parcel stowed incorrectly in the hold can shift at sea and upset the vessel's stability, while a miscalculated stowage factor leaves the hold full by volume but empty by tonnage — meaning the freight you paid for goes to waste.
On top of that sits a regulatory layer: scrap shipments are subject to inspection for radiation, grading and waste legislation. Skipping the pre-loading screening or presenting incomplete documents means cargo sitting at the port for days. At Novi Engineering we manage both layers — operational stowage and regulatory compliance — from a single point.
- Correct stowage factor calculated for the cargo type
- Stowage plans that account for hold stability and shifting risk
- Pre-loading radiation screening and certification
- Compliance checks against waste and export legislation


